Summary
This document is a progress report for the restoration and preparation project for nursery schools and day care centres damaged by earthquake and tsunami on 27 February 2010. (2011, 9pp)
Description
This document is a progress report for the restoration and preparation project for nursery schools and day care centres damaged by earthquake and tsunami on 27 February 2010.
This report includes:
- 1. An assessment of the progress made to this date (March 2010 to March 2011).
- 2. An execution strategy and work program for the next period:
- 2.1. Requirements and results of the proposed work program.
- 2.2. Description of the contributions, works carried out and performance of the activity.
- 2.3. Pictures of both finished works and works under progress.
Reconstruction of Kindergartens and Pre Schools– Progress Report March 2010–March 2011 [PDF 1.3mb]
Reconstruction of Kindergartens and Pre Schools– Progress Report March 2010–March 2011 [Word 2.6mb]
To view Portable Document Format (PDF) files you need a PDF
reader. PDF files can be viewed using a number of different software
products. Some free alternatives include:
Name |
Platform |
Windows, MacOSX, |
|
Windows, Unix/Linux |
|
Windows, MacOSX, |
|
Windows, Unix/Linux |
NOTE: The Australian Government does not endorse or offer
warranties as to the suitability or safety of any of the above-listed products.
As with any software installation, care should always be taken to verify that
the software being installed is appropriate for your needs and malware-free.
To view Microsoft Word (.doc or .docx) files you need either a licensed copy of Microsoft Word, or a free Word Viewer which can be downloaded from www.microsoft.com.au. Rich Text (.rtf) files can also be viewed using this software.