 |
Annual Report
1998-99 |
 |
ANNEX D
Australian Accounting Reports sent to the IAEA between
1 July 1998 and 30 June 1999, under Australias NPT Safeguards
Agreement with the IAEA.
Number of Reports Sent |
MBA |
ICR |
PIL |
MBR |
Total |
HIFAR, ANSTO |
AS-A |
0 |
1 |
1 |
2 |
Moata, ANSTO |
AS-B |
0 |
1 |
1 |
2 |
R&D Laboratories, ANSTO |
AS-C |
12 |
2 |
1 |
15 |
Vault Storage, ANSTO |
AS-D |
0 |
1 |
1 |
2 |
Miscellaneous Locations |
AS-E |
0 |
0 |
0 |
0 |
Total |
|
12 |
5 |
4 |
21 |
Number of Entries Covered
by These Reports |
MBA |
ICR |
PIL |
MBR |
Total |
HIFAR, ANSTO |
AS-A |
0 |
27 |
9 |
36 |
Moata, ANSTO |
AS-B |
0 |
6 |
6 |
12 |
R&D Laboratories, ANSTO |
AS-C |
27 |
106 |
28 |
161 |
Vault Storage, ANSTO |
AS-D |
0 |
11 |
6 |
17 |
Miscellaneous Locations |
AS-E |
0 |
0 |
0 |
0 |
Total |
|
27 |
150 |
49 |
226 |
Routine Safeguards Inspections Performed by the IAEA during
1998/99.
1998 |
Type |
1999 |
Type |
10 July |
MBA AS-A |
20 January |
MBA AS-A |
11 to 13 August |
MBA AS-A, Comp |
17 February |
MBA AS-A |
9 & 10 September |
MBA AS-A |
23 to 25 March |
MBAs AS-A, AS-D, Comp |
6 to 8 October |
MBA AS-A, Comp |
21 April |
MBA AS-A |
13 November |
MBA AS-A |
20 May |
MBA AS-A |
15 & 16 December |
MBA AS-A |
21 to 25 June |
MBAs AS-A, AS-B, AS-C |
|
|
28 & 29 June |
Complementary access visit at Ranger mine |
MBA - Material Balance Area (see Table
4 )
ICR - Inventory Change Report
PIL - Physical Inventory Listing
MBR - Material Balance Report
|